http://www3.nhk.or.j...3290991000.html In the Fukushima Daiichi Nuclear Power Station TEPCO, before 7:00 pm on 18, a power outage occurs, Unit 3 and Unit 1, in the spent fuel pool of Unit 4, and has stopped the system to cool the nuclear fuel it, and TEPCO I am looking into the cause. Results before 7 pm April 18, a power outage occurs instantaneously at building important seismic isolation has become the center of the work convergence of the accident of the nuclear power plant Fukushima Daiichi, TEPCO was examined, one of the power supply facility within the site I have found that the unit is stopped. Although it would not affect the water injection into the reactor in Unit 3 Unit 1 Unit 1 and Unit 3, the system has stopped to cool the nuclear fuel in the spent fuel pool of Unit 4 it. Unit 1 and Unit 3, water temperature is turned 25 degrees and 13.7 degrees on the current from 18 to 4 pm, in the spent fuel pool of Unit 4, the temperature rise of 0.1 degrees per hour from 0. about three times, it is expected to be about 04 to more than 65 degrees that are prescribed by the provisions of TEPCO's house. TEPCO is based on that you are looking into the cause, cause to enter the recovery process of the cooling system of the spent fuel pool as soon as identified. That's according to the Nuclear Regulatory Authority of the country, of the power plant, that there was trouble in the vicinity of high-voltage cable that leads to the power distribution board. In this trouble, it is not to change the value of the monitoring post to measure the value of the radiation that is disposed around the primary. TEPCO "I was trying to announce compiled after confirming the status of the equipment, it took time for the confirmation. Not sorry" for the delay in announcing I'm talking with. Would of thought would have lots of electric generators their by now.. No power for last 4 and a half hours... http://english.kyodo.../03/214898.html Electricity trouble occurs at crippled Fukushima nuclear power plant TOKYO, March 18, Kyodo Tokyo Electric Power Co. said Monday a problem with electric power has occurred at its crippled Fukushima Daiichi nuclear power plant, leading to the suspension of the system to cool spent fuel pools of the Nos. 1, 3 and 4 units. The incident, however, so far has not affected the ongoing water injection to the Nos. 1 to 3 reactors, which suffered core meltdowns in the early days of the March 2011 nuclear crisis, according to the Nuclear Regulation Authority. No abnormality has been detected in radiation levels in areas surrounding the plant in Fukushima Prefecture. Unit 4 cooling is down then..